Nov
27

More trail carving on south side creek bank

TRAILS: 1.25 hours: 1:30 PM to 2:45 PM

Continued carving trail up the south side bank at the lower creek crossing in RMZ unit #3.

Continued carving the path up the bank on the south side of Clearwater Creek where the trail crosses near tidewater. Finished up to where the trail meets the side stream and connects with the South Creek Edge trail – about 15 feet. Hacked out roots & rocks and created a level grade.Shoveled out the side stream  channel to deepen and direct it so that the water doesn’t spread out and muddy the trail.

Written by john. Posted in Blogs, Clearwater Creek blog